日本www色-日本www色高清视频-日本www色视频-日本www色视频成人免费网站-黄网免费观看-黄网免费看

濟南鑫魯泉盛機械設(shè)備有限公司

導航
您的位置:首頁>新聞中心>常見問題

水泥罐倉除塵器怎么安裝?

來源:http://www.44yd.cn/ 發(fā)布時間:日期:2025-05-09 1

一、安裝前準備工作

1、 Preparation work before installation

設(shè)備選型核查

Equipment selection verification

在安裝前必須嚴格核對除塵器型號規(guī)格與水泥罐倉的匹配性,包括處理風量、過濾面積等關(guān)鍵參數(shù),確保設(shè)備性能滿足工況需求。同時需檢查設(shè)備外觀是否完好,內(nèi)部濾袋等核心部件有無運輸損傷。

Before installation, it is necessary to strictly check the compatibility between the dust collector model and specifications and the cement tank compartment, including key parameters such as processing air volume and filtration area, to ensure that the equipment performance meets the requirements of the working conditions. At the same time, it is necessary to check whether the appearance of the equipment is intact and whether there is any transportation damage to the core components such as the internal filter bag.

工具材料準備

Preparation of tools and materials

安裝需配備完整的工具套裝:包括不同規(guī)格的扳手套裝(8-19mm)、電動螺絲刀、水平儀、密封膠槍等專業(yè)工具。材料方面需準備耐高溫密封膠、304不銹鋼螺栓組(含平墊彈墊)、防爆電氣接線端子等。

Installation requires a complete set of tools, including wrench sets of different specifications (8-19mm), electric screwdrivers, level gauges, sealant guns, and other professional tools. In terms of materials, it is necessary to prepare high-temperature resistant sealant, 304 stainless steel bolt sets (including flat pads and spring washers), explosion-proof electrical wiring terminals, etc.

現(xiàn)場環(huán)境準備

On site environment preparation

安裝區(qū)域需進行徹底清理,使用工業(yè)吸塵器清除罐倉頂部積塵。設(shè)置隔離警戒區(qū),避免交叉作業(yè)影響安裝質(zhì)量。準備防雨防塵臨時遮擋設(shè)施,確保安裝過程不受天氣影響。

The installation area needs to be thoroughly cleaned, using an industrial vacuum cleaner to remove dust from the top of the tank compartment. Set up isolation and warning areas to avoid cross operation affecting installation quality. Prepare temporary shelter facilities for rain and dust prevention to ensure that the installation process is not affected by weather.

二、安裝流程

2、 Standardized installation process

定位測量

Positioning measurement

采用全站儀進行精確定位,根據(jù)罐倉結(jié)構(gòu)CAD圖紙確定除塵器安裝坐標。需考慮檢修空間要求(建議保留≥800mm環(huán)形通道),并避開倉頂安全閥等關(guān)鍵部件。

Using a total station for precise positioning, determine the installation coordinates of the dust collector based on the CAD drawings of the tank structure. Consider the maintenance space requirements (it is recommended to retain a circular channel of ≥ 800mm) and avoid key components such as the safety valve on the top of the warehouse.

c90922efbf6c2b6.jpg

支架安裝

Bracket installation

選用δ=8mm碳鋼支架,采用M16化學錨栓固定。安裝時使用激光水平儀校準,水平度偏差需控制在3‰以內(nèi)。焊接部位需做防銹處理,并完成24小時承重測試。

Choose a carbon steel bracket with δ=8mm and fix it with M16 chemical anchor bolts. During installation, a laser level should be used for calibration, and the horizontal deviation should be controlled within 3 ‰. The welding area needs to undergo rust prevention treatment and complete a 24-hour load-bearing test.

管道連接

Pipeline connection

(1)進氣管道采用法蘭連接,石棉墊片需做浸油處理

(1) The intake pipeline adopts flange connection, and the asbestos gasket needs to be treated with oil immersion

(2)出風管道安裝膨脹節(jié)補償熱位移

(2) Installation of expansion joints to compensate for thermal displacement in the air outlet duct

(3)所有接口需進行氣密性檢測(0.05MPa保壓測試)

(3) All interfaces need to undergo air tightness testing (0.05MPa pressure holding test)

主體安裝

Main installation

吊裝時使用專用平衡梁,就位后采用扭矩扳手緊固螺栓(扭矩值參照GB/T3098.1)。最終檢測垂直度偏差≤2mm/m。

Use a dedicated balance beam during lifting, and tighten the bolts with a torque wrench after positioning (torque values refer to GB/T3098.1). The final verticality deviation is ≤ 2mm/m.

電氣安裝

Electrical installation

(1)按IEC標準敷設(shè)阻燃電纜

(1) Lay flame-retardant cables according to IEC standards

(2)防爆區(qū)域需使用ExdⅡBT4等級電器元件

(2) Explosion proof areas require the use of Exd Ⅱ BT4 grade electrical components

(3)接地電阻測試值≤4Ω

(3) Grounding resistance test value ≤ 4 Ω

本文由倉頂除塵器友情奉獻.更多有關(guān)的知識請點擊:http://www.44yd.cn我們將會對您提出的疑問進行詳細的解答,歡迎您登錄網(wǎng)站留言.

This article is a friendly contribution from the pneumatic conveying system For more information, please click: http://www.44yd.cn We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message

相關(guān)產(chǎn)品 / Related products

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動雙插板閥

    氣動雙插板閥

  • 氣動擺動閥

    氣動擺動閥

2024  濟南鑫魯泉盛機械設(shè)備有限公司     備案號:魯ICP備18012408號-3  魯公網(wǎng)安備37018102000806號

主站蜘蛛池模板: 婷婷综合在线 | 天天爱天天干天天操 | 欧美一级专区免费大片 | 免费观看黄色片 | 2021国产成人午夜精品 | 一级香蕉视频 | 中文字幕一区二区三区在线不卡 | 精品免费在线视频 | 精品无人区一区二区三区a 精品午夜国产在线观看不卡 | 日本一区二区在线视频 | 日日拍夜夜嗷嗷叫视频 | 高清波多野结衣一区二区三区 | 欧美日韩免费看 | 国产成人刺激视频在线观看 | 国产免费a | 色香欲亚洲天天综合网 | 五月天激情丁香 | 男人和女人日皮视频 | 蜜桃社极品尤物大尺度美女 | 色视频网站免费 | 日韩性公交车上xxhd免费 | 亚洲成网站www久久九 | 一级片a| 亚洲成人bt | 午夜宅男影院 | 欧日韩视频 | 一级一毛片 | 97视频免费观看 | 国产高清不卡一区二区 | 婷婷视频网 | 97精品视频在线观看 | 米奇777第四久久久99 | 玖玖香蕉 | 欧美一区2区三区3区公司 | 免费看国产一级片 | 日韩中文字幕网站 | 亚洲国产精品线播放 | 成年人视频在线免费观看 | 日本免费xxx | 午夜做性视频 | 乳色吐息在线观看免费 |